Monday, August 23, 2010

House defect

After we got our house keys, we booked a session with the developer for join inspection. We manage to book the session 1 month later as it was fully book on the Saturday.

We went to our house twice on checking the whole house. The first thing we encounter was leakage of water on the entrance and the master room ceiling. Water stain was very obvious on the ceiling. The living area and the dinning area have pond of water. Two of my bed room wood vinyl floors come out. We have demand the developers to change them for us.

We spotted quite a number of defect. Mainly on uneven furnishing on windows, slanting windows panel, poor quality on the switch part, and many more small and tiny details to check. Remember one concept that we have pay so much for the house, everything that you are no satisfy, you can complain about it.




The land at the back yard... The land is sinking....
WE decide to cement the back yard to preventing the mud to split over my back wall. Mainly because it is more easy to maintain.
Poor workman ship in the stairs.....
My dad told me to check the hollowness of each and single tiles. So we have the knock knock every single tiles with the 50 cents coin, but later the developer say that we can't check like this. We can only use our hand to to knock each tile. Poor TS hand was hurt after the inspection.
The developer spend almost 1 month to repair all my defects.... why? Because we are so detail on our defects.

3 comments:

uLi.佑莉 said...

My turn to check defect soon!

Agnes Sim said...

wow...their work is quite poor wo...leaking here n there.

office painting said...

Budget constraints should never impact structures to possible catastrophic defects. That is just unacceptable for any contractor to waive.